Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 47 results ...

Abdelgawad, M A M (2011) Hybrid decision support system for risk criticality assessment and risk analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Al-Bataineh, M T (2008) Scenario-based planning for tunnelling construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Allouche, E N (2001) A decision-support model for selection of a trenchless construction method, Unpublished PhD Thesis, , University of Alberta (Canada).

Alvanchi, A (2011) Incorporating the effects of complex dynamic interactions in the construction decision making process, Unpublished PhD Thesis, , University of Alberta (Canada).

Awad, A L S (2012) Intelligent contractor default prediction model for surety bonding in the construction industry, Unpublished PhD Thesis, , University of Alberta.

Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Chehayeb, N N (1996) Simulation-based project control, Unpublished PhD Thesis, , University of Alberta (Canada).

Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance, Unpublished PhD Thesis, , University of Alberta (Canada).

Dissanayake, G M (2006) An integrated computational intelligence framework for construction performance diagnosis, Unpublished PhD Thesis, , University of Alberta (Canada).

Ekyalimpa, R (2015) A distributed simulation approach for contractor company performance management in the construction industry, Unpublished PhD Thesis, , University of Alberta.

El Ghandour, W (2007) Integrated information-based construction simulation system, Unpublished PhD Thesis, , University of Alberta (Canada).

Elbarkouky, M M G (2010) A fuzzy consensus building framework for early alignment of construction project teams on the extent of their roles and responsibilities, Unpublished PhD Thesis, , University of Alberta (Canada).

ElNimr, A A (2011) Enhancing space modeling and mobile resources planning in construction operations through a simulation driven visualization framework, Unpublished PhD Thesis, , University of Alberta (Canada).

Fan, H (2007) Leveraging operational data for intelligent decision support in construction equipment management, Unpublished PhD Thesis, , University of Alberta (Canada).

Hajjar, D (1999) A unified modeling methodology for simulation-based planning of construction projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Hasan, M S (2013) Decision support system for crane selection and location optimization on construction sites, Unpublished PhD Thesis, , University of Alberta (Canada).

Inyang, N I (2013) A framework for ergonomic assessment of residential construction tasks, Unpublished PhD Thesis, , University of Alberta (Canada).

Langevine, R (2006) A decision support system for the maintenance management of buildings, Unpublished PhD Thesis, , University of Alberta (Canada).

Liu, J (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction, Unpublished PhD Thesis, , University of Alberta.

Lu, M (2000) Productivity studies using advanced ANN models, Unpublished PhD Thesis, , University of Alberta (Canada).

Mah, D E (2011) Framework for rating the sustainability of the residential construction practice, Unpublished PhD Thesis, , University of Alberta (Canada).

Manavazhi, M R (1998) A configuration-based modeling methodology for the automated generation of simulation models in construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Mao, X (2008) The framework of TRIZ-enhanced-value engineering analysis and its knowledge management, Unpublished PhD Thesis, , University of Alberta (Canada).

Moghadam, M (2014) Lean-mod: An approach to modular construction manufacturing production efficiency improvement, Unpublished PhD Thesis, , University of Alberta (Canada).

Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information, Unpublished PhD Thesis, , University of Alberta (Canada).

Mogollon, J D M (2009) Automation of design and drafting for wood frame structures and construction waste minimization, Unpublished PhD Thesis, , University of Alberta (Canada).

Mohamed, Y (2002) A framework for systematic improvement of construction systems, Unpublished PhD Thesis, , University of Alberta.

Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects, Unpublished PhD Thesis, , University of Alberta (Canada).

  • Type: Thesis
  • Keywords: genetic algorithms; measurement; measurement method; optimization; project team; construction project; client satisfaction; construction phase; feedback; forecasting; safety; client; project performance
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305382025
  • Abstract:
    Performance management of construction projects is one of the most challenging and critical tasks carried out by construction organizations. The successful delivery of construction projects requires management of all project aspects. The main objective of this research is to develop an integrated framework for evaluation, forecasting and optimization of performance of construction projects. This research focuses on the construction phase of a project and is intended for implementation by contractors. This research presents a systematic and comprehensive integrated model for performance management. A systematic and unified construction performance measurement methodology was developed to evaluate and integrate all project objectives including cost, schedule, cashflow, profitability, safety, quality, project team satisfaction, and client satisfaction. Using dynamic Markov Chains, a stochastic model was developed to forecast the dynamic nature of construction performance. The forecasting model incorporates user feedback, historic trends, and latest project status to predict the performance of any objective at any future time and at project completion. Moreover, the integrated model offers an innovative mechanism, using genetic algorithms, to assist users select corrective action plans that lead to better project performance. In addition, this research proposes the concept of a guide in a matrix form to resolve contradictions among the various performance indices. This research introduced a framework for managing a distributed project performance system using multi agent systems. It also included an extensive literature review that identified and discussed specific work related to measurement, forecasting, and optimization of performance of construction projects. The proposed integrated framework is unique in the sense that it is mathematically derived and it deals with a single project phase. Although the proposed methodology is intended for use by contracting companies during the construction phase, it can be adapted for use by any project-driven company during any phase of a project. The proposed system is based on quantitative models, but it does not eliminate the role of sound subjective judgment and feedback by users. It offers a tool to assist construction managers better plan their projects through efficient and effective decision-making.

Olearczyk, J (2010) Crane lifting operation planning and lifted object spatial trajectory analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Pereira, E S S (2017) A framework for assessing the safety performance of industrial projects using safety-related measures, Unpublished PhD Thesis, , University of Alberta.

Saba, F (2012) A semantic-driven framework for facilitating reusability and interoperability of construction simulation modeling, Unpublished PhD Thesis, , University of Alberta (Canada).

Salem, O M (1999) Infrastructure construction and rehabilitation: Risk-based life cycle cost analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Shaheen, A A-H I (2005) A framework for integrating fuzzy set theory and discrete event simulation in construction engineering, Unpublished PhD Thesis, , University of Alberta (Canada).

Shahin, A A (2007) A framework for cold weather construction simulation, Unpublished PhD Thesis, , University of Alberta (Canada).

Sharma, V (2010) Asset levels of service-based decision support system for municipal infrastructure investment, Unpublished PhD Thesis, , University of Alberta (Canada).

Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints, Unpublished PhD Thesis, , University of Alberta.

Soleimanifar, M (2016) Integrated project management framework for a pipe spool fabrication shop, Unpublished PhD Thesis, , University of Alberta.

Song, L (2004) Productivity modeling for steel fabrication projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Taghaddos, H (2010) Developing a generic resource allocation framework for construction simulation, Unpublished PhD Thesis, , University of Alberta (Canada).

Van Tol, A A (2005) Agent embedded simulation modeling framework for construction engineering and management applications, Unpublished PhD Thesis, , University of Alberta (Canada).

Wang, P (2006) Production-based large scale construction simulation modeling, Unpublished PhD Thesis, , University of Alberta (Canada).

Xie, H (2011) Improving dynamic project control in tunnel construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Xie, H (2012) Improving dynamic project control in tunnel construction, Unpublished PhD Thesis, , University of Alberta.

Xu, J (2001) CAD-based integrated simulation environment (CAD-ise), Unpublished PhD Thesis, , University of Alberta (Canada).

Younes, B (2013) A framework for invoice management in construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Yu, H (2010) An integrated approach toward lean for production homebuilders, Unpublished PhD Thesis, , University of Alberta (Canada).

Zhang, X (2006) Toward innovative and efficient infrastructure delivery, Unpublished PhD Thesis, , University of Alberta (Canada).